• Home
  • About GEAPS
  • News
  • Meetings
  • Chapters
  • Knowledge
  • Networking
  • Opportunities
  • GEAPS Exchange
  • Leadership Conference
  • Chapter Meetings
  • Leadership Meetings
  • exchange
  • expo
  • education
  • register

GEAPS Exchange 2012 Expo Pods

Process Control Components

Monday, Mar. 5, 10:30--11:15 a.m. & 1:15--2 p.m.
Tuesday, Mar. 6, 10:30--11:15 a.m.

expo podsAt Exchange 2012, the Expo Pods will be featuring process-control equipment. Companies will explain and demonstrate what the equipment does, how it should be installed and maintained, and the best methods of troubleshooting. Each pod will focus on equipment such as hazard-monitoring sensors, belt-alignment, motion-speed detection and temperature sensors.

There will be 12 different sessions in four pods located in the Expo Hall—eight on Monday, March 5, and four Tuesday, March 6— all during regular Expo-Hall hours.

The pods are curtained-off areas in the expo hall, and offer equipment demonstrations for small groups of people. They provide up-close, hands-on learning opportunities. No PowerPoint!

Pod Schedule
Pod 1

Monday, Mar. 5

10:30-11:15 a.m.
Bin Access Control System, Brock Grain Systems

1:15-2 p.m.
Remote Access to Haz-Mon Systems, Industrial Automation Engineering Inc

Tuesday, Mar. 6

10:30-11:15 a.m.
Levels of Automation, Kasa Industrial Controls Inc

Pod 2

Monday, Mar. 5

10:30-11:15 a.m.
Predictive Maintenance with Wireless, Banner Engineering

1:15-2 p.m.
Hazard Monitoring System in a Box, CMC Industrial Electronics Ltd

Tuesday, Mar. 6

10:30-11:15 a.m.
Bucket Elevator Hazard-Monitoring System, Electro-Sensors Inc

Pod 3

Monday, Mar. 5

10:30-11:15 a.m.
Elevator Control System, Demo and Troubleshooting, Control Stuff Inc

1:15-2 p.m.
Hazard-Monitoring Devices, Selection and Operation, Maxi-Tronic Inc

Tuesday, Mar. 6

10:30-11:15 a.m.
Elevator Control System: Demo and Troubleshooting Guidelines, CompuWeigh Corp

Pod 4

Monday, Mar. 5

10:30-11:15 a.m
Cloud Computing and Remote-Asset Management, Lakeland Company

1:15-2 p.m.
Speed-Switch Monitors, 4B Components Ltd

Tuesday, Mar. 6

10:30-11:15 a.m.
Point Level Indicators, Monitor Technologies LLC